The BSLBATT ESS-GRID C225/C241 is a fully integrated energy storage system for small-to-medium commercial and industrial facilities. Unlike battery-only cabinets that require a separate inverter, each ESS-GRID unit ships with a 125kW PCS, EMS, BMS, fire suppression, thermal control, and intelligent monitoring pre-installed in a single outdoor enclosure.
Standard configurations include 225kWh (14 battery packs) and 241kWh (15 battery packs), each built with 314Ah LFP cells at 16.07kWh per pack. Custom capacities are available from 177kWh through 200kWh to 241kWh for projects with specific sizing requirements.
The system supports grid-tied, off-grid (with optional STS module), and hybrid operation, and can be paired with diesel generators for backup redundancy.
The BSLBATT 200kWh Battery Cabinet utilizes a design that separates the battery pack from the electrical unit, increasing the safety of the cabinet for energy storage batteries.
BSLBATT C&I ESS Battery has the world's leading battery management technology, including dual integration of active and passive fire protection, and the product setup has PACK level fire protection, group level fire protection, and dual-compartment level fire protection.
314Ah Lithium Iron Phosphate Cells
Large Capacity Design
Each 16S1P battery pack delivers 16.07kWh using 314Ah cells. The C241 configuration uses 15 packs for a total system capacity of 241kWh.
Advanced LFP Module Patent Technology
Each module adopts CCS, with a single PACK capacity of 16kWh.
Higher Energy Efficiency
Guaranteed energy efficiency/cycle with high energy density design, >95% @0.5P/0.5P
Connect up to 4 ESS-GRID cabinets in parallel on the AC side for systems up to 500kW and 964kWh. Supported in both grid-connected and off-grid (with STS) configurations.
Each ESS-GRID C225/C241 provides a standard 2-hour backup at rated power. To extend backup duration, add ESS-BATT battery cabinets (such as the Cubicon series) on the DC side for 4-hour, 6-hour, or 8-hour configurations without additional inverters.
The ESS-GRID C225/C241 supports three system configurations to match different project requirements. All three topologies support utility grid connection, diesel generator integration, and automatic load transfer through the built-in ATS interface.
PV connects directly to the cabinet's DC bus via built-in MPPT inputs (up to 150kW PV capacity, 3 MPPT channels). Best for new installations where the solar array and storage system are designed together. Maximizes round-trip efficiency by avoiding double AC-DC conversion.
PV feeds through a separate solar inverter to the AC bus, while the cabinet handles storage independently. Ideal for retrofitting storage onto existing PV systems without modifying the original solar installation.
Combines both approaches. Part of the PV array connects to the cabinet's DC input, while additional PV capacity connects through external inverters on the AC side. Suits large commercial sites that need to maximize total PV capacity beyond the cabinet's 150kW DC input limit.
For distributors and wholesalers building a commercial energy storage product portfolio, the ESS-GRID Cabinet Series offers standardized outdoor systems in multiple capacity tiers. This simplifies inventory management while covering projects from 100kWh to nearly 1MWh.
EPC firms and system integrators can simplify the design of commercial solar-plus-storage systems with pre-integrated PCS, BMS, and EMS, eliminating the need for multi-vendor coordination. Three supported topologies—DC coupling, AC coupling, and AC-DC coupling—also provide design flexibility across different project types.
Facility owners and operators can use the system to reduce peak demand charges, increase PV self-consumption, or add backup power to their sites. Common installations include farms, hotels, schools, warehouses, factories, and community solar parks.
For microgrid and off-grid project developers, the system provides a complete outdoor energy storage solution with optional STS for black start and islanding capability. For projects that require battery-only cabinets with a third-party inverter, see the ESS-BATT Cubicon series.
BSLBATT C&I energy storage products are organized into two series:
ESS-GRID provides integrated plug-and-play systems with built-in PCS, BMS, EMS, and fire suppression. Connect to the grid and start operating with no additional equipment.
ESS-BATT provides battery-only cabinets for projects that use a third-party inverter or existing PCS infrastructure. The ESS-BATT Cubicon offers 200-241kWh capacity and also serves as the DC-side expansion unit for ESS-GRID systems.
The ESS-GRID C108 is a smaller integrated system for commercial sites under 100kW.
For projects needing higher energy density and longer cycle life in a similar footprint, the LC125-261 liquid-cooled system offers 8,000+ cycles and tighter thermal management.
For projects exceeding 500kW or requiring MWh-scale storage, contact our team for containerized system options.
| Feature | ESS-GRID C225/C241 | ESS-GRID C108 | LC125-261 | ESS-BATT Cubicon |
| Series | ESS-GRID (integrated system) | ESS-GRID (integrated system) | ESS-GRID (integrated system) | ESS-BATT |
| Built-in PCS | Yes (125kW) | Yes (50kW) | Yes (125kW) | No (external inverter required) |
| Capacity | 225 / 241 kWh | 100 / 108 kWh | 261 kWh | 200-241 kWh |
| Cooling | Air-cooled | Air-cooled | Liquid-cooled | Air-cooled |
| Cycle Life | 6,000+ | 6,000+ | 8,000+ | 6,000+ |
| AC Parallel | Up to 4 (500kW / 964kWh) | - | Up to 8 (2 MWh) | - |
| IP Rating | IP55 | IP55 | IP55 | IP55 |
| Best For | Medium commercial: farms, hotels, schools, warehouses | Small commercial: retail stores, small workshops | High-density, high-cycle industrial sites | Projects using third-party inverters; DC expansion for ESS-GRID |
BSLBATT manufactures the ESS-GRID Cabinet Series at its 20,000+ sqm production facility in Huizhou, China, with 3GWh+ annual capacity. Buying direct from the factory eliminates intermediary markups on commercial energy storage systems.
Standard lead time is 25 to 30 days from order confirmation. All ESS-GRID systems include a 10-year warranty covering battery performance and system components.
Request a quote for single-unit pricing or volume discounts on multi-system deployments.
BSLBATT ESS-GRID cabinets come in two standard configurations: C225 (225kWh) and C241 (241kWh), both using 314Ah LFP cells at 16.07kWh per battery pack. Custom capacities from 177kWh to 241kWh are available by adjusting the number of battery packs installed (11 to 15 packs per cabinet). Contact our team to configure a system that matches your site load profile.
BSLBATT ESS-GRID cabinets come in two standard configurations: C225 (225kWh) and C241 (241kWh), both using 314Ah LFP cells at 16.07kWh per battery pack. Custom capacities from 177kWh to 241kWh are available by adjusting the number of battery packs installed (11 to 15 packs per cabinet). Contact our team to configure a system that matches your site load profile.
BSLBATT ESS-GRID cabinets support two expansion methods. AC-side parallel connection links up to 4 systems for a combined capacity of up to 500kW and 964kWh. DC-side expansion adds ESS-BATT battery cabinets to extend backup duration from 2 hours to 4, 6, or 8 hours per unit without additional inverters.
BSLBATT ESS-GRID C225/C241 supports off-grid operation and black start when equipped with the optional STS (Static Transfer Switch) module. In off-grid mode, the system provides seamless power transfer during utility outages. The STS module is ordered separately and integrates directly into the cabinet's electrical compartment.
BSLBATT ESS-GRID C225/C241 holds IEC 62619 and IEC 62477 / EN 62477 for electrical safety, IEC 61000 / EN 61000 and CE for electromagnetic compatibility, IEC 62116 for grid-connection and islanding protection, and IEC 61683 / IEC 60068 for energy efficiency and environmental testing.
BSLBATT ESS-GRID systems (including the C225/C241) are integrated plug-and-play solutions with a built-in PCS, BMS, EMS, and fire suppression. They are designed for buyers who want a complete, ready-to-operate energy storage system. ESS-BATT products (such as the Cubicon series) are battery-only cabinets for projects that use a third-party inverter or existing PCS infrastructure. ESS-BATT Cubicon cabinets also serve as DC-side expansion units for ESS-GRID systems.
| Model | ESS-GRID C225 | ESS-GRID C241 |
| System Parameter | 125kW / 225kWh | 125kW / 241kWh |
| Cooling Method | Air-cooled | |
| Battery Parameters | ||
| Rated Battery Capacity | 225kWh | 241kWh |
| Rated System Voltage | 716.8V | 768.0V |
| Opearting Voltage Range | 627.2V~795.2V | 627.0V~852.0V |
| Cell Capacity | 314Ah | |
| Max. Charge / Discharge Current | 157A | |
| Battery Series-parallel Connection Method |
1P*16S*14S | 1P*16S*15S |
| Charge temp. / Discharge temp.Method | 0~55℃ / -20~55℃ | |
| PV Parameters (Optional; none / 50kW / 150kW) | ||
| Starting Voltage | 200V | |
| Max. PV Power | 150kW | 150kW |
| MPPT Quantity | 3 | |
| MPPT Voltage Range | 250-620V | |
| MPPT Full Load Open Circuit Voltage Range (Recommended)* |
360V-580V | 360V-620V |
| AC Parameters | ||
| Rated AC Power | 125kW | |
| Nominal AC Current Rating | 181A | |
| Max. AC Current Rating | 199A | |
| Rated AC Voltage | 400Vac / 230Vac 3W+N+PE / 3W+PE | |
| DC Side Voltage Range | 580~1000V (3P3W) / 670~1000V (3P4W) | |
| DC Side Full Load Voltage Range | 625~927V (3P3W) / 680~927V (3P4W) | |
| Rated Frequency | 50Hz/60Hz(±5Hz) | |
| Total Current Harmonic Distortion (THDI) | <3% (Rated Power) | |
| Power Factor Adjustable Range | 1 Ahead~+1 Behind | |
| General Parameters | ||
| Protection Level | IP55 | |
| Fire Protection System | Hot-air aerosol | |
| Isolation Method | Non-isolated(Optional Transformer) | |
| System Operating Temperature | -25℃~55℃ (>45℃ derating) | |
| Altitude | 3000m | |
| Communication Interface | RS485 / CAN2.0 / Ethernet | |
| Dimension (L*W*H,mm) | 1850*1430*2300 (±5) | |
| Weight (With Batteries Approx.) | 3197kg±3% | 3310kg±3% |
| Certification | ||
| Electric Safety | IEC62619 / IEC62477 / EN62477 | |
| EMC (Electromagnetic Compatibility) | IEC61000 / EN61000 / CE | |
| Grid-connected And Islanded | IEC62116 | |
| Energy Efficiency And The Environmentt | IEC61683 / IEC60068 | |